Dalrymple Bay Coal Loader, North Queensland
10 October 2007
The challenge
Provide long term assistance over 20 years for the development of world scale coal loading facility and devise a robust enclosure solution for four kilometre long conveyors built over salt water in a cyclone zone.
The solution
- Design and supply enclosure materials including 120 tonnes of extruded aluminum purlins and girts and 25,000 square metres of PERMALITE LT7® cladding with a cyclone rated fixing system.
- Provide ongoing technical assistance and on site support to consulting engineers and construction contractors over three phases of the facility’s expansion.